Projects

Microsoft

Project Details

Customer

Eaton

End User

Microsoft

Sites

Virginia, Washington, & Wyoming

Product

Custom designed Deposit on Base Enclosure (DOBE) for MV Switchgear

Challenge

Short lead time to place buildings on-site

Solution

AMR PEMCO devised a floor-less building (DOBE) with the same features as a typical AMR PEMCO building. The DOBE was delivered the same day as the switchgear for setup on the concrete pad. This eliminated shipping equipment to AMR PEMCO for install in a traditional equipment building. This solution allowed the project to succeed on time and under budget.

Other Projects

Palo Verde

Palo Verde

Customer General Electric (GE) End User APS Palo Verde Sites Arizona, USA Product (3) 15' x 60' (4.6m x 18.3m) Excitation Buildings w/ 100T HVAC Challenge Design Exciter Compartment with severe environmental and code requirements for Nuclear application. Solution AMR...

Florida Power & Light

Florida Power & Light

Customer GE Energy End User Florida Power & Light Site Fort Lauderdale, FL USA Challenge Designed to be erected on-site with fully integrated electrical service and HVAC. The design must also be certified to sustain a 200 MPH (322KPH) wind load.

LA Metro

LA Metro

Customer Balfour Beatty Rail End User LA Metro Sites Los Angeles Area - California USA Product Traction Power Substations for Blue and Gold Line Extensions Challenge Coordinate installation between Mass Electric and the LA Metro

Ready to Elevate Your Operations?

From start to finish we will be your Partner in Technology.