Customer
GE Energy
End User
Florida Power & Light
Site
Fort Lauderdale, FL USA
Challenge
Designed to be erected on-site with fully integrated electrical service and HVAC. The design must also be certified to sustain a 200 MPH (322KPH) wind load.