Electrical Project CustomerGE Energy End UserFlorida Power & Light SiteFort Lauderdale, FL USA ChallengeDesigned to be erected on-site with fully integrated electrical service and HVAC. The design must also be certified to sustain a 200 MPH (322KPH) wind load.